Virtual Flipbooks
Nearly twenty years ago, when I was cutting my teeth in a stormwater research and development laboratory, the debate over the most appropriate method to measure
Whether you are involved with the design, installation or the manufacture of stormwater BMP’s, the key ingredient to a successful project is communication.
Corrugated Metal Pipe (CMP) is the construction material of choice for underground stormwater detention and infiltration projects. With its low cost, a wide
In last month’s blog post, we took a look at the Point on a Curve sizing methodology. In this month’s post, we will look at the other common HDS sizing
Proper sizing of hydrodynamic separators (HDS) should start with checking applicable regulations. In many cases, local or state regulations will dictate how to